Inventory the inputs first
List material masses, manufacturing or supplier data, print and finishing processes, transport activity, retained equipment and intended treatment. Assign units and dates to every input. Separate measured data, supplier information and assumptions. Unknown quantities should remain visible and trigger a request, rather than becoming zero in a total.
Use factors for their intended purpose
The UK Government publishes conversion factors for company greenhouse gas reporting, with a 2026 edition and methodology. These can support relevant activity calculations such as fuel, electricity and transport. They do not automatically supply a product-specific manufacturing footprint for an exact printed material.
Keep provenance beside the result
Record the factor identifier, unit, source version, geography and activity it is applied to. Explain whether the total includes the same stages for all options. Include the assumptions that dominate the result and provide a range or sensitivity test where the uncertainty is material.
Return a useful incomplete result
When data are missing, provide a readiness report: what is known, what cannot yet be calculated and the next input to obtain. A planning estimate can help shape a decision while remaining separate from independently reviewed evidence or an environmental claim intended for customers.
Worked example — illustrative
A project has transport distance and material dimensions, but no reliable product manufacturing data. The worksheet can list the available transport activity and measurement basis while flagging missing mass, process and product factors. It returns a clear readiness report instead of a complete total. A supplier request then targets the missing input that matters most to the proposed comparison.
- List quantities with units.
- Separate measurements from assumptions.
- Retain factor identity and method.
- Return a missing-input plan.