THE EVENT GRAPHICS INTELLIGENCE HUBMATERIALS · CARBON · REUSE · EVENTS · EVIDENCE

Free public tools

A useful result. No account required.

Photograph or describe your current display, map its components and explore its next life. Add a multi-event carbon studio and 24 visual decision tools with portable results.

START WITH WHAT YOU OWN

PHOTOGRAPH YOUR DISPLAY. PLAN ITS NEXT LIFE.

Add photos or system details, pin the components, record condition and compare keep, refresh, repair and replacement plans using your actual evidence.

Open your visual system assessment ↗
Context photograph: Tuen Mun Fa Pau Exhibition Hall interior 201504; events context, not an identified product or supplier on this page.

THE WHOLE PROGRAMME

EVENT CARBON & RESOURCE STUDIO

Components. Events. Retain, refresh and replace. Cost and carbon pacing across an entire season.

Launch the scenario flight deck ↗
Context photograph: HK Central City Hall lower block Exhibition Hall interior 葉欣 Ip Yan white wooden chair n Table 13-Aug-2013; events context, not an identified product or supplier on this page.

Campaign blueprintA dimensional graphic sits between the entered purpose, audience, dates and location. Add details fields are highlighted.PURPOSEIllustrative event briefAUDIENCEEvent visitorsDEPLOYMENTPlanning examplePLACEIndoor exhibition1,000 × 2,000 mm · 1 items2 m² entered graphic area
Planning

Campaign brief builder

Turn the purpose, practical constraints and evidence needs into a brief you can share.

Explore the interactive tool
Retained-frame comparisonEntered geometry match: Yes. Condition and actual compatibility remain separate review decisions.EXISTING FRAMEREQUIRED GRAPHIC1000 × 2000 mm1000 × 2000 mmCondition: to review · Fit: to review
Reuse

Equipment reuse assessment

Check condition and next-use requirements before buying a replacement.

Explore the interactive tool
Asset booking timelineTimeline widths represent entered start and inclusive end dates. Separate lanes remain visible for overlap review.INCLUSIVE DRAFT BOOKINGS · NOT RESERVATIONSFRAME-012026-11-01 → 2026-11-03FRAME-012026-11-04 → 2026-11-060 entered overlaps · 2 bookings (2 shown)
Planning

Asset availability planner

Check a draft schedule for overlapping asset bookings. Confirm reservations through the shared workspace.

Explore the interactive tool
Exact-unit rulersThe two rulers represent the same physical distance, labelled in the entered source and target units. Display rounding is separate from the exact conversion.1,000 mm = 1 mSource ruler: mmEquivalent physical length: m
Artwork

Dimensional unit converter

Convert exact dimensional units, with rounding kept visible.

Explore the interactive tool
Batch area mosaicEach symbol stands for one entered graphic, not a nesting plan. Area per item 2 m². Mass is not estimated without grammage.20 m² total · 10 items (10 symbols shown)
Materials

Display area calculator

Calculate printed area and quantity before comparing material options.

Explore the interactive tool
Final-scale resolution lensThe raster symbol is illustrative; the effective resolution and threshold bar come from the final scale calculation. Vector content has no raster PPI result.1,000 mm final output152.4 PPIEntered threshold 150 PPIEnlargement × 1 · 6000 entered pixels
Artwork

Artwork scale and resolution checker

Calculate effective raster resolution at final output size using your supplier’s threshold.

Explore the interactive tool
Fit and crop windowThe solid target window shows centred fit. Dashed geometry outside it indicates rendered source beyond the target. Target area unfilled: 50%.FIT · rendered 1,000 × 1,000
Artwork

Aspect ratio and resize helper

See what fits, what crops and how much geometry changes.

Explore the interactive tool
Production boundary layersCopper outer area is bleed; the trim is outlined; the inner green area is the entered safe boundary. These are entered provider specifications.Bleed 5 mm · trim 1000 × 2000 mm · safe inset 20 mm
Artwork

Bleed and safe-area visualiser

Draw the trim, bleed and inset specified by your production provider.

Explore the interactive tool
Overlapping panel gridRegular entered panel geometry, including overlapping edges. 10 of 10 panels drawn. Coverage excludes fabrication constraints.5 columns × 2 rows · 10 mm overlap · 10 panels
Materials

Sheet and panel coverage estimator

Estimate an axis-aligned panel grid with explicit overlap.

Explore the interactive tool
Sheet nesting mapAs entered grid. Edge margins and inter-part gaps use real input geometry; 8 part rectangles shown. This is a uniform-grid heuristic.8 parts/sheet · 13 sheets · 66.12% usable-area occupancy
Materials

Material yield and nesting explorer

Explore simple rectangular packing and useful sheet area. A grid estimate is not an optimum nesting plan.

Explore the interactive tool
Site allocation treeA quantity allocation tree keeps site amounts and contingency separate. Bar lengths reflect entered quantities, not a delivery route.PROGRAMME20 allocated unitsSITE-A · 12SITE-B · 8Separate contingency: 1 units2 sites; 2 shown. No geographic location inferred.
Planning

Multi-site quantity planner

Keep each site allocation visible and choose a separate contingency quantity.

Explore the interactive tool
Replacement assembly diagramExploded conceptual frame and replacement face using entered dimensions. Material to review, artwork to review. Layer offsets illustrate the assembly; they are not manufacturing dimensions.ASSET: Add details hardware1000 × 2000 mm · Fixing to reviewCompatibility: not yet confirmed
Reuse

Replacement graphic specification

Create a supplier-ready draft without assuming that similar dimensions confirm compatibility.

Explore the interactive tool
Connection and separation graph2 stated connections; 2 shown. Proposed destination to review. Separation approaches need competent hazard and receiver review.COMPONENT → CONNECTION → PROPOSED SEPARATIONCOMPONENTSubstrateadhesiveacceptance to reviewRESPONSIBLE OWNERproject ownerCOMPONENTFrameboltscompetent inspection requRESPONSIBLE OWNERasset owner
Recovery

Component and disassembly checklist

Record the entire construction, how it separates and who will assess hazards.

Explore the interactive tool
Readiness deadline mapDeadline points use entered dates; colour distinguishes a self-recorded confirmed state from unconfirmed tasks. This is not an event readiness approval.Brief2026-11-01 · Recorded confirmedArtwork2026-11-03 · Add details1 unconfirmed tasks · event date to review
Planning

Event readiness checker

Spot unknown, overdue and review-needed tasks before a deployment.

Explore the interactive tool
Evidence constellationThe constellation shows supplied fields, not evidence quality. Entered state: to review. Date validity gaps are included in the actual result.7TO REVIEWsubjectsourcemethodgeographydatescopereviewer
Evidence

Evidence completeness checker

Identify missing fields and scope limitations. Completeness measures information, not environmental performance.

Explore the interactive tool
Lifecycle boundary mapAn input-readiness boundary map. It intentionally does not draw a carbon score from incomplete mass, factor, transport or recovery data.FUNCTIONAL OUTCOME: Add detailsBOUNDARY: Add detailsMATERIAL MASS0 kgFACTORAdd detailsGEOGRAPHYAdd detailsFOOTPRINT NOT CALCULATED1 planned deployments · transport/recovery still need scoped evidence
Evidence

Lifecycle comparison input builder

Build a functional-unit and input-readiness record before attempting a footprint comparison.

Explore the interactive tool
Allocated transport routeSchematic route, not a geographic map. Entered distance × mass in tonnes determines allocated activity. Factor suitability is separate.ENTERED DISTANCE100 kmACTIVITY BASIStonne-kmALLOCATED LOAD100 kg10 tonne-kmEntered-factor result: Not calculated
Evidence

Transport scenario checker

Separate transport arithmetic from factor suitability and missing load assumptions.

Explore the interactive tool
Inspection lead-time calendarInspection due Add details, next deployment Add details. The lead-time path does not record an inspection, release or actual reuse.ASSETAdd detailsCONDITIONto reviewRESPONSIBLEAdd detailsAdd detailsAdd details14 days inspection lead timeINSPECTION → REPAIR / REVIEW → RELEASEStorage requirements to review
Reuse

Reuse and maintenance planner

Set inspection, repair, storage and next-use responsibilities from a real condition record.

Explore the interactive tool
Return-chain mass flowMass-width accounting partitions the dispatched quantity into unreconciled transit, rejected, accepted treatment-to review and treatment-confirmed quantities. Collection never becomes automatic recycling.DISPATCHED100 kgRECEIVED90 kgTREATMENT CONFIRMED0 kgTransit 10 · rejected 10 · treatment to review 80 · confirmed 0 kgReceipt and treatment references remain self-recorded.
Recovery

Return-chain quantity reconciler

Reconcile collection, receipt, rejection and treatment quantities without double counting.

Explore the interactive tool
Commitment delivery pathThe delivery path ties a requested commitment to an owner, deadline, acceptance evidence, consent and actual work. It does not claim a social benefit has occurred.COMMITMENTAdd detailsOWNERAdd detailsDEADLINEAdd detailsACCEPTANCEAdd detailsCONSENTAdd detailsACTIONSAdd detailsPLANNED ACTIVITY ≠ DELIVERED OUTCOME
Planning

Social commitment planner

Translate an actual accessibility, labour or community commitment into an attributable task.

Explore the interactive tool
Measured stand planA to-scale overhead plan using entered position, rotation and footprint. Copper signals geometry beyond the stand. Clearance is arithmetic, not access or venue approval.6 × 4 m stand · display (1, 1) · 0°Minimum boundary clearance 1 m
Planning

Two-dimensional stand planner

Explore a simple display layout and circulation geometry with numeric equivalents.

Explore the interactive tool
Orbitable concept geometryAn orbitable isometric concept from entered stand, footprint, position and elevation. It is not structural, fixing, installation or fire approval.CONCEPT · 35° camera · 2.4 m entered height6 × 4 m stand · 2 × 1 m display at (1, 1)
Planning

Conceptual three-dimensional preview

Visualise entered geometry and retain a numeric plan for review.

Explore the interactive tool
Photograph credits · 6 page-owned images

These images provide editorial context for a useful result. no account required.. They do not establish a supplier relationship, product identity, event booking or environmental performance.

  1. Entrance of Gamescom 2022 in the Cologne Trade Fair center (52760292328).jpg — dronepicr. CC BY 2.0. Resized to a maximum of 960×720; WebP encoding; metadata stripped. No creative alteration.
  2. Porsche racing simulators at Gamescom 2022 in Cologne, Germany (52760064794).jpg — dronepicr. CC BY 2.0. Resized to a maximum of 960×720; WebP encoding; metadata stripped. No creative alteration.
  3. Mini Aceman Pokémon Car at Gamescom 2022 in Cologne, Germany (52760293903).jpg — dronepicr. CC BY 2.0. Resized to a maximum of 960×720; WebP encoding; metadata stripped. No creative alteration.
  4. HK Central City Hall Exhibition Hall 06 interior Oct-2012.JPG — Dynearol210. CC BY-SA 3.0. Resized to a maximum of 960×720; WebP encoding; metadata stripped. No creative alteration.
  5. Tuen Mun Fa Pau Exhibition Hall interior 201504.jpg — Wing1990hk. CC BY 3.0. Resized to a maximum of 960×720; WebP encoding; metadata stripped. No creative alteration.
  6. HK Central City Hall lower block Exhibition Hall interior 葉欣 Ip Yan white wooden chair n Table 13-Aug-2013.JPG — LetsCeleB. CC BY-SA 3.0. Resized to a maximum of 960×720; WebP encoding; metadata stripped. No creative alteration.
EVENT CARBON STUDIO ↗