Start with the decision
Map each model input to a process or service requirement. Define the required units, geography, period and product scope before seeking a factor or quantity. Available data are not automatically relevant data.
Build the record
Record measured values, supplier information and assumptions distinctly. Include mass, production, printing, finishing, logistics and treatment where the boundary requires them. Keep source and version with every value and explain any justified proxy.
Check before acting
Check compatibility with the functional outcome and method. Do not substitute a generic organisational reporting category for an exact manufacturing question without a defensible assessed basis. Missing data should produce a request and a qualified result.
Worked example — illustrative
A fictional analyst has dimensions for one board and a generic transport factor. The factor can support suitable transport activity but not manufacture the board’s product footprint. The readiness report asks the supplier for relevant mass and product data while preserving the known logistics input.
Keep a useful handover
Close the “Choose relevant input data for an environmental scenario” decision with a named owner and a dated evidence version. The next working record is “Build a lifecycle record”. Record whether that step is planned or confirmed; retain the prior decision if new information changes the instruction.
- Map inputs to processes.
- Specify units and scope.
- Record source states.
- Explain proxies.
- Request missing relevant data.
