Identify the agreed baseline and the proposed change
Record the customer's current specification, artwork, assembly version and required service. Describe the precise substitute, including the named variant, thickness, finish, fixings and any retained components. Explain why the change is proposed, such as availability or a revised application. A broad statement that another board is equivalent leaves too much uncertainty about what will actually be supplied.
Check which requirements and claims may change
Compare appearance, print and finishing compatibility, handling, dimensions, intended duration and relevant technical requirements. Review the evidence for recycled content, sourcing, fire performance or recovery only within its actual scope. Record unanswered questions and ask the responsible supplier or specialist for confirmation. A favourable feature of the new substrate does not establish a lower footprint or suitable performance for the whole finished display.
Obtain a decision on a reviewable version
Provide the customer with the actual proposed construction, sample or relevant evidence and clearly stated limitations. Identify who has authority to approve the change and which decisions need other competent input. Keep visual acceptance separate from technical suitability and environmental wording. Record any conditions, date and approved version; a discussion about a possible substitution is not permission to change the ordered product.
Preserve the accepted change in the assembly record
Use the Material substitution request template and update the assembly passport only with the actual responsible decision. Keep the original specification and the reason for change so earlier deliveries remain attributable. Recheck the proposed receiver's acceptance if construction changes affect the return route. Downloading the request does not notify the customer or amend a contract; Leaf Accord's local record supports the real approval and supply process.
