Preserve the rejection and its actual scope
Identify the batch, receiving party, date and material affected by the decision. Retain the receiver's explanation and distinguish a whole-load refusal from a rejected component or temporary hold. Compare the delivered construction and condition with the original acceptance enquiry. A previous general response may not cover changed finishing, contamination or quantity; preserve both records rather than editing the enquiry to match the later result.
Keep custody and responsibility clear
Record where the material now sits, which party controls it and who must agree the next movement or handling action. Confirm relevant practical and legal responsibilities through the actual parties and applicable guidance. Do not assume the carrier or receiver can store the load indefinitely. A local status of rejected describes the record; it does not itself transfer responsibility or authorise a different treatment route.
Investigate without converting a possibility into a solution
Ask whether the load can be corrected, separated or directed to another appropriate receiver, with the actual conditions documented. Consider relevant handling requirements and costs before proposing preparation work. Record a possible alternative as pending until a party accepts the described load. Do not report recycled quantities from a collection booking, a proposed redirection or a promise to resolve the rejection.
Publish a bounded exception in the outcome
Use the Treatment outcome record to preserve confirmed quantities, the rejected portion, the explanation and the owner of the next check. If a public summary exists, correct any statement that collection guaranteed treatment. Export the record for the responsible team and retain the source evidence. Leaf Accord can structure the exception; it does not adjudicate a dispute, classify the waste or arrange a lawful alternative destination.