Start with the decision
List faces, core, coatings, adhesives, trims and fixings. Identify whether separation is designed and safe to perform. Do not assume a metal face makes a composite a solid-metal recycling stream.
Build the record
Create a step sequence with tools, access, handling and responsibilities. Link relevant manufacturer instructions and competent review. Record which components stay intact and which are damaged or remain bonded.
Check before acting
Trial an appropriate representative teardown and retain observations. Ask receivers about actual separated streams or the complete remaining assembly. Count retained parts and treatment batches in distinct states without double-counting material.
Worked example — illustrative
A fictional display panel has metal skins, a core and an attached trim. The team records the construction and tests supported trim removal. The skins remain bonded to the core, so it asks about the composite rather than offering it as clean metal. A separate frame stays in inventory.
Keep a useful handover
Close the “Plan disassembly of a mixed-material panel” decision with a named owner and a dated evidence version. The next working record is “Prepare a recovery enquiry”. Record whether that step is planned or confirmed; retain the prior decision if new information changes the instruction.
- Identify layers and fixings.
- Plan tools and competence.
- Trial supported separation.
- Ask about actual streams.
- Keep retained material separate.
