Start with the decision
Describe how the display will be made, assembled, moved and dismantled. Identify which connections transfer loads or preserve stability and which merely hold a graphic face. A fold drawing helps communicate design but does not establish performance for the delivered construction.
Build the record
Record board identity, orientation, cuts, scores, tabs, adhesive, connectors and supports. Link drawings to the assembly version and name the responsible design reviewer. Include tool access and packing position. Note which connections are intended to be undone and which components must stay bonded.
Check before acting
Build a representative prototype and document observed folding, fit and damage over the intended handling sequence. Obtain relevant competent review for loaded or freestanding structures. Keep prototype observations distinct from laboratory ratings. Recheck recovery if joints add different materials or make separation impractical.
Worked example — illustrative
A fictional display uses locking tabs to retain a board face. The first prototype damages a tab during teardown, so the team changes the connection and repeats the handling trial. The final record includes the tab geometry, assembly sequence and practical separation steps, with stability approval kept as its own review.
Keep a useful handover
Close the “Plan folds joints and fixings for a board structure” decision with a named owner and a dated evidence version. The next working record is “Explore material references”. Record whether that step is planned or confirmed; retain the prior decision if new information changes the instruction.
- Record board and orientation.
- Map connection functions.
- Trial assembly and teardown.
- Keep competence requirements visible.
- Version the accepted geometry.