Give the batch a stable reference
Identify the originating project, material or assembly versions, location and proposed receiver. Record quantities for distinguishable parts of the load rather than hiding mixed constructions under one label. Include relevant condition and preparation information. If several projects contribute to a batch, retain their individual references so a later receipt or outcome can be matched to the material actually included.
Record the quantity and its basis together
Use the unit appropriate to the observation: items counted, dimensions measured, area calculated or mass obtained from a suitable measurement. State the date, method, responsible recorder and any uncertainty. Keep an estimate labelled as an estimate. An area can support a material enquiry but is not automatically a measured mass; an assumed density or thickness needs its own source and scope.
Reconcile the physical load and the paperwork
Check whether packaging, hardware and rejected items are included in a stated total. Record the change when a load is split, relabelled or partly returned. Retain the original value instead of overwriting it with a later receiver figure. Where quantities differ, investigate scope, units and method before assuming loss or treatment. A discrepancy identifies a question, not a confirmed environmental outcome.
Create a batch record ready for the receiver
Use the Return batch register to preserve the inventory and quantity basis. After collection, compare the subsequent stage records in the Return-chain quantity reconciler. Identify the records still needed for an outcome summary, including any unresolved portion. Downloading the batch information does not transfer custody or book a collection; the responsible parties must confirm the actual load, required official documentation and acceptance through their own process.
