Set the evidence expectation for each location
Start with a location list, agreed quantities, installation window and the artwork version intended for each site. Decide what a completion record must identify: the site, installed item, date, responsible recorder and relevant exception. Where photographs are useful, specify the view needed and avoid capturing unnecessary personal or confidential information. Dispatch, arrival and installation are separate milestones.
Reconcile actual work against the approved plan
Record which items were installed, held back, substituted, damaged or returned. Explain a quantity difference rather than filling the expected value into the actual field. A photograph of one display does not confirm the whole location's order, and one completed site does not establish completion across the estate. Preserve the actual material or assembly version when a local change occurred.
Connect exceptions to the next decision
Assign an owner to missing evidence, compatibility problems and remaining stock. Decide whether an exception calls for confirmation, repair, revised instructions or a replacement. Consider whether surplus graphics match another genuine need before producing extra copies. Keep an agreed correction separate from evidence that it happened, and avoid claiming waste reduction from an action that remains only a proposal.
Prepare an honest rollout review
Use the multi-site quantity planner for the intended allocation, then keep actual completion and return references in a workspace record. Summarise confirmed sites, unresolved sites and the cut-off date. Report observed deployments separately from estimated future use or environmental outcomes. Export the review for the campaign owner; local saving does not notify stores, commission installers or confirm their acceptance.