Purpose and boundary
This playbook supports property and built-environment teams managing physical communications. It organises the graphic and asset decisions alongside the actual site responsibilities. It does not provide building, structural, fire or legal approval.
Required starting information
Property and built-environment teams should begin by establishing site owner and authorised decision roles and private location and surface records. Plan place-specific graphics and retained fixtures with permissions, competent installation and refreshable information. Use the remaining inputs below to define who may make, record and review the graphic decisions.
- Site owner and authorised decision roles
- Private location and surface records
- Graphic purpose, dimensions, duration and access needs
- Retained fixture model and condition
- Applicable site and competent review requirements
- Removal, repair, return and accepted treatment plan
Working method
Map each location, support and message to stable IDs. Keep private access details restricted, and distinguish current site information from campaign artwork.
Specify the complete applied construction: face, print, finish, adhesive, backing, fixings and support. Obtain relevant site permission and competent review for the actual installation.
Assess retaining fixtures and changing only approved graphic faces. Record fitting, cleaning and removal conditions; trial representative interfaces without turning observations into formal ratings.
Use a scoped handover for installation and maintenance. Track the artwork and assembly versions actually fitted, with responsible confirmation and condition information.
At refresh or retirement, record retained components separately from removed batches. Request receiver acceptance for the actual construction and preserve receipt and outcome evidence.
Evidence and handover
The handover for property and built-environment teams should answer: Who authorised the placement and use? Which assembly and artwork were installed? Keep the relevant source versions and named decisions with those answers so the next team can distinguish a proposed action from a recorded outcome.
- Who authorised the placement and use?
- Which assembly and artwork were installed?
- What care and replacement conditions apply?
- What actual removed material reached an accepted destination?
Scope and limitations
A public material record does not approve a site or structure.
A source or sourcing certificate applies only to its defined subject.
Privacy and accessibility require actual review of the project and audience.
Method
- Map each location, support and message to stable IDs. Keep private access details restricted, and distinguish current site information from campaign artwork.
- Specify the complete applied construction: face, print, finish, adhesive, backing, fixings and support. Obtain relevant site permission and competent review for the actual installation.
- Assess retaining fixtures and changing only approved graphic faces. Record fitting, cleaning and removal conditions; trial representative interfaces without turning observations into formal ratings.
- Use a scoped handover for installation and maintenance. Track the artwork and assembly versions actually fitted, with responsible confirmation and condition information.
- At refresh or retirement, record retained components separately from removed batches. Request receiver acceptance for the actual construction and preserve receipt and outcome evidence.
