Intended application
Portable systems holding a graphic under defined tension.
Describe the construction
Named base, poles, tension mechanism, graphic and attachment.
Application and construction
Portable systems holding a graphic under defined tension.
Named base, poles, tension mechanism, graphic and attachment.
Decision and evidence scope
Measure the interface and retain the supplier fitting specification with the asset.
Before retaining tension banner systems, establish the model and condition of Named base, poles, tension mechanism, graphic and attachment. Which dimensions, fittings and supported conditions match the model? Keep the support and replacement graphic as separate records. A changed layout or use may need competent review; use and return evidence determines what was actually retained.
- Which dimensions, fittings and supported conditions match the model?
- Which supplied variant, assembly and period does each document cover?
- Which components can remain in use, and who accepts the actual final load?
What this reference cannot establish
Tension behaviour and footprint differ across systems despite similar graphics.
For tension banner systems, the first evidence request is: Which dimensions, fittings and supported conditions match the model? Record the exact supplied variant and the person answering that request. This construction guide cannot approve the finished item or establish its environmental footprint.
- No exact supplied product has been independently tested or certified by this reference.
- No numerical impact factor or guaranteed environmental saving is asserted.
Evidence to request
- Which dimensions, fittings and supported conditions match the model?
- Which supplied variant, assembly and period does each document cover?
- Which components can remain in use, and who accepts the actual final load?
Limits to keep visible
- Tension behaviour and footprint differ across systems despite similar graphics.
- No exact supplied product has been independently tested or certified by this reference.
- No numerical impact factor or guaranteed environmental saving is asserted.
